HUAWEI BTS3900 INSTALLATION MANUAL PDF

BTS GSM Installation Guide(V_13).pdf – Download as PDF File .pdf), and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. What is a base station installation guide 1) Introduction to base stations BTS Installation Guide for Enhancing Existing Cabinets ( Registering for a free account gives you a number of additional benefits, including access to additional valuable information that you can browse or download.

Author: Akinogrel Fauramar
Country: Latvia
Language: English (Spanish)
Genre: Life
Published (Last): 6 June 2004
Pages: 419
PDF File Size: 7.62 Mb
ePub File Size: 11.96 Mb
ISBN: 759-6-96371-390-5
Downloads: 9133
Price: Free* [*Free Regsitration Required]
Uploader: Zolojora

Indoor Cabling Requirements Cables are routed indoors through the feeder window.

3900 Series & 5900 Series Base Station Installation Guides

C referred to as BTSL cabinet, boards, modules, and cables. Page 73 Cable clips must be vertical with cables, and the cables in a cable clip must be parallel.

Page 27 Sign the Packing List with the customer. This bts39900 guide plays great emphasis on impacts of new component installation on the running base station.

Reset Password

Ensure that the depth of each hole ranges from 50 mm 1. Page The connectors of the RF cables are fixed in position to avoid false connection that may cause an abnormal voltage standing wave ratio VSWR.

  ELMALILI HAMDI YAZIR TEFSIR PDF

After routing cables neatly and correctly, tighten the screws on cable clips. Its typical scenarios include: Capacity expansion This document describes how to install hardware for a running base station.

Mouse Operations The mouse operations that may be found in this document are defined as follows. The cabinet door can be removed before the cabinet is installed for easy operations. Figure BTSL in a single- or dual-mode scenario 1.

HUAWEI BTSL INSTALLATION MANUAL Pdf Download.

Step 6 Install the protective cover, and then use a screwdriver to tighten the screws. Cabling Requirements Sufficient slack recommended for about 0. Page 47 Step 3 Position the support.

By pressing ‘print’ button you will print only current page. Tighten the captive screws on both sides of the panel to 0.

Prerequisites The input power cables are correctly and securely connected. Page 43 M12x60 bolts to secure the base, as shown in Figure Remove the dustproof caps from the optical connectors at the end labeled 1A and 1B on the fiber optic cables, and insert the optical connectors into the optical modules in BBU 1. Compared with 03no information is deleted. Command Conventions The command conventions that may be found in this document are defined as follows.

  2010 HIGHLANDER MANUAL PDF

Switch huawi the battery breaker in battery cabinet and APM30 when installing the battery! If the current temperature is out of the range, make protection measures or route the cables again.

Step 5 Use a screwdriver to tighten the screws on the wiring terminals. Secure cables on the cable tray, as shown in Figure In this scenario, two 80A input power cables are used for upper and lower shelves. Page 5 Examples of information displayed on the screen are in Courier New. Cables are routed in an untangled and orderly fashion.

Huawei BTSA Installation Guide V1 5 | Pradeep Liyanage –

Remove the board, and check whether any pin of the slot on the backplane is bent, broken, or missing. The armor of the AC cable need to be grounded.

Types of base stations. Installation Guide for Capacity Expansion. Step 2 Check the btw3900 of the packing case.